Our Works
Timeline
2024
- The overhaul of the for buoys of the CBM system of CLCM
- Marina Vilhamoura Foreport
- Protective breakwater for the Pico slabs
- CLCM – Madeira Fuel Logistics Company
- Madeira Cements
- APRAM
2022
- Reprofiling of the Port of Ponta Delgada (completion)
- Lajes das Flores Pier Bridge (Under construction)
- Tabua Submarine Outfall
- Repair of the Lajes do Pico Breakwater
- CLCM – Madeira Fuel Logistics Company
- Cimentos Madeira
- APRAM
2020
- CLCM - Madeira Fuel Logistics Company
- Reprofiling of the Port of Ponta Delgada (São Miguel) in progress
- Topo Pier (São Jorge)
- Rehabilitation of the Pontinha Exterior Jetty (Madeira Island)
- Pier 4 of the Port of Sesimbra
- Wood Cements
- Underwater Inspections at APRAM Ports
- Inspections of RAM Submarine Emissaries
2018
- Major repair of Madalena Jetty on Pico Island - Azores
- Tunisian Submarine Outfall - Tunisia
- Dry Dock of Casablanca - Morocco
2016
- Protective jetty of the new wastewater treatment plant in Câmara de Lobos (Madeira island)
2014
- Pier 8 of the Port of Funchal (Madeira Island)
- Bata Port (2nd Phase, conclusion 2015)
- Demolition of the old bridge / Bata Pier
2012
- Santa Luzia and João Gomes rivers pipelines (Completion 2013) (Madeira Island)
- New Marina of Funchal (Madeira Island)
- Bata Oil Port
- Bata Military Pier
2010
- Port of Luba (Equatorial Guinea)
- Naval Shipyard ASABA (1st phase)
2007
- Porto Santo Port (Repair of the External Jetty, completed 2008)
- Port of Malabo (Pier 9 and Roll on / Roll off Ramp, completed 2008)
2005
- Caniçal Harbor (Interior Pier) (Madeira island)
- Aid Station to Castaways (Madeira island)
2003
- Port of Machico (3rd phase) (Madeira island)
- Recreational Port of Santa Cruz (Madeira island)
- Seixal Pier (Madeira island)
- Port of Porto Moniz (Madeira island)
- Caniçal Port (Outside jetty 3rd phase, complete 2004) (Madeira island)
2001
- Quinta do Lorde Marina (Complete 2002) (Madeira island)
- Ribeira Brava pier (Madeira island)
1999
- Funchal Roll on / Roll Off ramp (Madeira island)
- Caniçal Harbor (Outside Jetty) (Madeira island)
1997
- Port of Machico (Madeira island)
2023
- Lajes das Flores Pier Bridge (Completion)
- Lajes do Pico Protective Breakwater (Under construction)
- CLCM – Madeira Fuel Logistics Company
- Madeira Cements
- APRAM
2021
- Profiling of the Port of Ponta Delgada
- Pier 4 of the Port of Sesimbra
- CLCM - Madeira Fuel Logistics Company
- Wood Cements
- Underwater Inspections at APRAM Ports
- Lajes das Flores Pier Bridge
2019
- Funchal Submarine Emissary (Madeira Island)
- Requalification of the Recreational Port of Machico (Madeira Island)
- Topo Pier (São Jorge) (Madeira Island)
2017
- Submarine Emissary in Câmara de Lobos (Madeira island)
- Tunisian Submarine Outfall
2015
- Rehabilitation of the North Pier of the Port of Funchal (Madeira Island)
- Naval Shipyard ASABA (Tilted Plane, conclusion 2016)
2013
- São Tiago Beach (Madeira island)
- Funchal Sea Front Beach (Madeira island)
- Naval Shipyard ASABA (2nd Phase, conclusion 2014)
- Malabo Military Port (2nd Phase, concluded 2014)
2011
- Bata port (Pier at -12, 1st phase, completion 2012)
- Corisco Island (Polls)
2008
- Marina and Beach of Machico (Madeira island)
- Port of Malabo (Pier 9 and Roll on / Roll off Ramp, 2008 completion)
- Malabo Military Port (completed 2009)
2006
- <ul>
<li>Caniçal fishing pier (Madeira island)</li>
<li>EEM (Madeira electricity company) - Fuel Terminal of Socorridos (Madeira island) </li>
<li>Machico Sports Park (Madeira island)</li>
</ul>
2004
- Marina of Lugar de Baixo (Madeira island)
- Marina of Calheta (Madeira island)
- Paul do Mar pier (Madeira island)
- CLCM - PLEM - Sea Line - Terminal assistance (2004 to the present day) (Madeira island)
2002
- Pier of Câmara de Lobos (Madeira island)
- West and east pier of Caniçal port (Madeira island)
2000
- Port of Machico 2nd Phase (Madeira island)
- Port of Caniçal outside jetty 2nd phase, completed 2002) (Madeira island)
- Submarine Outfalls of Câmara de Lobos and Funchal - Technical Assistance (Madeira island)
1998
- Port of Caniçal (Madeira island)
- Travelift and access ramp to dry dock (Madeira island)
1996
- Port of Funchal (Jetty Repair) (Madeira island)
- Cimentos Madeira - Assistance to the Maritime Terminal (until today) (Madeira island)
